{"id":164253,"date":"2025-06-02T18:14:43","date_gmt":"2025-06-02T12:44:43","guid":{"rendered":"https:\/\/www.electronicsforu.com\/?p=164253"},"modified":"2025-06-02T18:17:41","modified_gmt":"2025-06-02T12:47:41","slug":"indias-fab-vision-on-track-despite-recent-setbacks","status":"publish","type":"post","link":"https:\/\/www.electronicsforu.com\/technology-trends\/indias-fab-vision-on-track-despite-recent-setbacks","title":{"rendered":"Is India\u2019s Fab Vision On Track Despite Recent Setbacks?"},"content":{"rendered":"\n<p><em>Paused, not derailed\u2014experts see the Adani and Zoho exits as distinct but strategic, not setbacks. Rather than failure, they signal a pivot: India\u2019s chip drive now hinges<br>on design depth and delivering existing models.<\/em><\/p>\n\n\n\n<p>On April 30, 2025, reports emerged that the Adani Group had paused discussions with Israel\u2019s Tower Semiconductor regarding a much-anticipated $10 billion chip fabrication model in India. A day later, software major Zoho announced the suspension of its $700 million plan to enter chip manufacturing.<\/p>\n\n\n\n<p>The Economic Times framed these exits as a \u201csetback to Prime Minister Narendra Modi, who has for several years tried to lure companies in his pursuit to make India a global chip manufacturing hub.\u201d<\/p>\n\n\n\n<p>Yet the reasons diverged. Zoho founder Sridhar Vembu explained that, despite an extensive search, the company could not secure a suitable technology partner to navigate the complexities of chipmaking. Adani, on the other hand, cited uncertainty around domestic demand and doubts over the model\u2019s viability.<\/p>\n\n\n\n<p>The shelving of two high-profile, capital-intensive ventures raises critical questions. What do these exits mean for India\u2019s semiconductor roadmap\u2014particularly as the domestic market is projected to reach $64 billion by 2026, and Union Electronics and IT Minister Ashwini Vaishnaw maintains that \u2018Made-in-India\u2019 chips will debut by year-end? Do these developments point to structural gaps in India\u2019s readiness for chip manufacturing? Are policy frameworks overly optimistic\u2014or are such shifts part of a natural evolution shaped by global headwinds?<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">A timeline<\/h2>\n\n\n\n<p>On September 6, 2024, Adani Group partnered with Israel\u2019s Tower Semiconductor to establish a $10 billion semiconductor fabrication plant in Taloja, near Mumbai, Maharashtra. Approved by the Maharashtra state government, the project was to be developed in two phases; the first with a production capacity of 40,000 semiconductor wafers per month, followed by expansion to 80,000 wafers per month in the second phase.<\/p>\n\n\n\n<p>The venture applied for subsidies under the India Semiconductor Mission (ISM)\u2019s incentive programme. However, the application remained under review by the central government, with no incentives granted. The plant was projected to generate nearly 5000 jobs.<\/p>\n\n\n\n<p>By May 2025, reports emerged that discussions had been terminated, as internal evaluations cited uncertainty about domestic semiconductor demand and concerns regarding Tower\u2019s financial commitment.<\/p>\n\n\n\n<p>In March 2023, Chennai-based software-as-a-service (SaaS) firm Zoho announced plans to establish a semiconductor design model in Tenkasi, Tamil Nadu. This initiative aimed to harness local talent and boost India\u2019s semiconductor design capabilities.<\/p>\n\n\n\n<p>In June 2023, Zoho applied for a licence under the ISM to set up a compound semiconductor fabrication plant. The company earmarked an initial investment of $200 million, with projections suggesting the total investment could reach $600 million, contingent on a suitable technology partnership.<\/p>\n\n\n\n<p>In December 2024, the Karnataka government approved Zoho\u2019s proposal to establish a semiconductor manufacturing facility in the Mysuru region. Valued at \u20b934.26 billion (approximately $400 million), the project was to be executed through Zoho\u2019s subsidiary, Silectric Semiconductor Manufacturing. The facility was expected to create approximately 460 jobs and would have been the state\u2019s first semiconductor unit.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"800\" height=\"507\" src=\"https:\/\/www.electronicsforu.com\/wp-contents\/uploads\/2025\/05\/Dr-Satya-Gupta.jpg\" alt=\"\" class=\"wp-image-164256\" style=\"width:530px;height:auto\" srcset=\"https:\/\/www.electronicsforu.com\/wp-contents\/uploads\/2025\/05\/Dr-Satya-Gupta.jpg 800w, https:\/\/www.electronicsforu.com\/wp-contents\/uploads\/2025\/05\/Dr-Satya-Gupta-500x317.jpg 500w, https:\/\/www.electronicsforu.com\/wp-contents\/uploads\/2025\/05\/Dr-Satya-Gupta-663x420.jpg 663w, https:\/\/www.electronicsforu.com\/wp-contents\/uploads\/2025\/05\/Dr-Satya-Gupta-150x95.jpg 150w, https:\/\/www.electronicsforu.com\/wp-contents\/uploads\/2025\/05\/Dr-Satya-Gupta-696x441.jpg 696w\" sizes=\"auto, (max-width: 800px) 100vw, 800px\" \/><\/figure><\/div>\n\n\n<p>However, in May 2025, the capital-intensive nature of semiconductor fabrication prompted Zoho to suspend the project. Sridhar Vembu noted, \u201cWe did not have that confidence in the tech, so our board decided to shelve this idea for the time being, until we find a better tech approach.\u201d<\/p>\n\n\n\n<p>These are not isolated cases. Previous big-budget semiconductor ventures have also faltered despite initial momentum. A notable example is the $19.5 billion joint venture between Vedanta and Foxconn to establish a semiconductor fab in Dholera, Gujarat, which was dissolved in July 2023.<\/p>\n\n\n\n<p>That venture also applied under the ISM but did not advance far enough to receive formal approval or fund disbursement. It faced setbacks, notably the inability to secure a committed technology partner. Talks with European semiconductor firm STMicroelectronics collapsed after the Indian government insisted on deeper technical involvement rather than superficial collaboration.<\/p>\n\n\n\n<p>Delays in incentive processing and escalating cost projections further complicated matters, culminating in Foxconn\u2019s exit from the joint venture by mutual consent. Vedanta has since explored alternative partnerships to pursue its semiconductor goals.<\/p>\n\n\n\n<p>And Dholera? It is now slated to host India\u2019s first approved commercial semiconductor fabrication facility. In March 2024, Tata Electronics and Taiwan\u2019s PSMC received approval for an \u20b9910 billion (~$11 billion) project focused on 28nm+ nodes for automotive, consumer, and industrial applications.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Why setting up a fab is not a cup of tea<\/h2>\n\n\n\n<div class=\"mepr_error\"><div class=\"locked-content\">\n<b>EFY++ CONTENT: ACCESS TO THIS CONTENT IS FREE! BUT YOU NEED TO BE A REGISTERED USER.<\/b><\/p>\n<p>Oops! This is an EFY++ article, which means it's our Premium Content. You need to be a Registered User of our website to read its complete content.<\/p>\n<p><b>Good News: <\/b>You can register to our website for FREE! <a href=\"https:\/\/www.electronicsforu.com\/plans\/subscription-plans\" target=\"_blank\" rel=\"noopener\">CLICK HERE<\/a> to register now.<\/p>\n<p><b>Already a registered member? <\/b>If YES, then simply login to you account below. (TIP: Use 'forgot password' feature and reset and save your new password in your browser, if you forgot the last one!)\n<\/div>\n<\/div><div>\n<div class=\"mp_wrapper mp_login_form\">\n                  <!-- mp-login-form-start -->     <form name=\"mepr_loginform\" id=\"mepr_loginform\" class=\"mepr-form\" action=\"https:\/\/www.electronicsforu.com\/login\" method=\"post\">\n            <div class=\"mp-form-row mepr_username\">\n        <div class=\"mp-form-label\">\n                              <label for=\"user_login\">Username<\/label>\n        <\/div>\n        <input type=\"text\" name=\"log\" id=\"user_login\" value=\"\" \/>\n      <\/div>\n      <div class=\"mp-form-row mepr_password\">\n        <div class=\"mp-form-label\">\n          <label for=\"user_pass\">Password<\/label>\n          <div class=\"mp-hide-pw\">\n            <input type=\"password\" name=\"pwd\" id=\"user_pass\" value=\"\" \/>\n            <button type=\"button\" class=\"button mp-hide-pw hide-if-no-js\" data-toggle=\"0\" aria-label=\"Show password\">\n              <span class=\"dashicons dashicons-visibility\" aria-hidden=\"true\"><\/span>\n            <\/button>\n          <\/div>\n        <\/div>\n      <\/div>\n            <div>\n        <label><input name=\"rememberme\" type=\"checkbox\" id=\"rememberme\" value=\"forever\" \/> Remember Me<\/label>\n      <\/div>\n      <div class=\"mp-spacer\">&nbsp;<\/div>\n      <div class=\"submit\">\n        <input type=\"submit\" name=\"wp-submit\" id=\"wp-submit\" class=\"button-primary mepr-share-button \" value=\"Log In\" \/>\n        <input type=\"hidden\" name=\"redirect_to\" value=\"\/wp-json\/wp\/v2\/posts\/164253\" \/>\n        <input type=\"hidden\" name=\"mepr_process_login_form\" value=\"true\" \/>\n        <input type=\"hidden\" name=\"mepr_is_login_page\" value=\"false\" \/>\n      <\/div>\n    <\/form>\n    <div class=\"mp-spacer\">&nbsp;<\/div>\n    <div class=\"mepr-login-actions\">\n      <a href=\"https:\/\/www.electronicsforu.com\/login?action=forgot_password\">Forgot Password<\/a>\n    <\/div>\n\n      \n    <!-- mp-login-form-end --> \n  <\/div>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Paused, not derailed\u2014experts see the Adani and Zoho exits as distinct but strategic, not setbacks. Rather than failure, they signal a pivot: India\u2019s chip drive now hingeson design depth and delivering existing models. On April 30, 2025, reports emerged that the Adani Group had paused discussions with Israel\u2019s Tower Semiconductor regarding a much-anticipated $10 billion [&hellip;]<\/p>\n","protected":false},"author":209730,"featured_media":164255,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[19,3713,8450],"tags":[12736],"class_list":{"0":"post-164253","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-technology-trends","8":"category-premium","9":"category-electronics-manufacturing","10":"tag-june-2025"},"_links":{"self":[{"href":"https:\/\/www.electronicsforu.com\/wp-json\/wp\/v2\/posts\/164253","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.electronicsforu.com\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.electronicsforu.com\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.electronicsforu.com\/wp-json\/wp\/v2\/users\/209730"}],"replies":[{"embeddable":true,"href":"https:\/\/www.electronicsforu.com\/wp-json\/wp\/v2\/comments?post=164253"}],"version-history":[{"count":1,"href":"https:\/\/www.electronicsforu.com\/wp-json\/wp\/v2\/posts\/164253\/revisions"}],"predecessor-version":[{"id":164671,"href":"https:\/\/www.electronicsforu.com\/wp-json\/wp\/v2\/posts\/164253\/revisions\/164671"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.electronicsforu.com\/wp-json\/wp\/v2\/media\/164255"}],"wp:attachment":[{"href":"https:\/\/www.electronicsforu.com\/wp-json\/wp\/v2\/media?parent=164253"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.electronicsforu.com\/wp-json\/wp\/v2\/categories?post=164253"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.electronicsforu.com\/wp-json\/wp\/v2\/tags?post=164253"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}